Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Brevard County Shore Protection Works Kick Off
Dredging

February 5, 2018 · about 8 years ago

Brevard County Shore Protection Works Kick Off

The U.S. Army Corps of Engineers said in its latest announcement that the Brevard County Shore Protection Project is now officially underway. The project will renourish approximately 13.4 miles of shoreline using 1.1 million cubic yards of sand from the Canaveral Shoals Borrow Area II. The contracto

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers said in its latest announcement that the Brevard County Shore Protection Project is now officially underway.

The project will renourish approximately 13.4 miles of shoreline using 1.1 million cubic yards of sand from the Canaveral Shoals Borrow Area II.

The contractor, Great Lakes Dredge and Dock Company (GLDD), will place sand on the North Reach (9.6 miles) and South Reach (3.8 miles). The North Reach is from Cape Canaveral through Cocoa Beach south to the northern end of Patrick Air Force Base. The South Reach includes the towns of Indialantic and Melbourne Beach.

Benefits from the project include reduced damage to property and infrastructure caused by future storm events and to ensure the beach is suitable for recreation and wildlife habitat, said USACE.

The beach will remain open to residents and visitors outside the work areas and the contractor expects to temporarily close at least 1,000 feet of beach at a time during the renourishment project.

The project is intended to restore the shoreline back to its designed level of storm protection that existed prior to the erosion from Hurricane Matthew and Irma. Benefits from the project include reduced damage to property and infrastructure, and to ensure the beach is suitable for recreation and wildlife habitat.

The cost of the project is $17.5 million and is 100 percent federally funded.

[mappress mapid=”24832″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free