Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Preparations for Clay Ripening Pilot Project in Full Swing
Dredging

February 7, 2018 · about 8 years ago

Preparations for Clay Ripening Pilot Project in Full Swing

EcoShape, the foundation that carries out the public-private Building with Nature innovation program, said in their latest announcement that the preparations for the Clay Ripening pilot project are in full swing now. “Yesterday we started digging the drainage trenches to remove excess water from the

2 minutes read
  • LinkedIn
  • X
  • Email

EcoShape, the foundation that carries out the public-private Building with Nature innovation program, said in their latest announcement that the preparations for the Clay Ripening pilot project are in full swing now.

“ Yesterday we started digging the drainage trenches to remove excess water from the Delfzijl location ,” said EcoShape.

Excessive levels of sediment in the Eems-Dollard area are having a negative impact on water quality and biodiversity. Large amounts of sediment accumulate in ports, making regular dredging necessary.

On the other hand, clay soil is needed in the area to strengthen dikes and to raise farmland.

According to EcoShape, collecting sediment from the Eems Dollard and converting it into clay soil creates a win-win situation: the water quality improves and there is more clay soil for reinforcing dikes and raising farmland.

The Hunze and Aa’s water authority will be using 70.000m³ of ripened clay to strengthen a one-kilometer section of dike in the ‘Broad Green Dike’ pilot project. This is a dike with a shallow slope covered by a relatively thick layer of clay and grass.

If the Clay Ripening pilot project is successful, the idea is to strengthen the remaining section of the dike (measuring about 11.5 kilometers) on the banks of the Dollard.

Pilot project

Rijkswaterstaat, the provincial authority of Groningen, Groningen Seaports, the Hunze and Aa’s water authority, nature conservation organisation Het Groninger Landschap and EcoShape have teamed up in the Clay Ripening pilot project to look at different ways of transforming sediment into clay soil.

EcoShape researchers are engaged in practical experiments to see which approach to ripening works best.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free