Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Indonesia: Tangguh LNG expansion project moving forward
Ports & Logistics

February 8, 2018 · about 8 years ago

Indonesia: Tangguh LNG expansion project moving forward

Construction is progressing on the Tangguh expansion project which includes the addition of a third train at the BP-operated LNG export facility in Indonesia. The expansion project will add a liquefaction unit of 3.8 million tons per annum (mtpa) of production capacity to the existing facility in Pa

1 minutes read
  • LinkedIn
  • X
  • Email

Construction is progressing on the Tangguh expansion project which includes the addition of a third train at the BP-operated LNG export facility in Indonesia.

The expansion project will add a liquefaction unit of 3.8 million tons per annum (mtpa) of production capacity to the existing facility in Papua Barat Province, bringing total plant capacity to 11.4 mtpa.

The project also includes two offshore platforms, 13 new production wells, an expanded LNG loading facility, and supporting infrastructure.

The UK-based energy giant BP on Thursday shared two images via its social media channels showing the construction progress of one of the two platforms for the expansion project due to start up by mid-2020.

The platform was named the Wiriager Deep A platform, according to BP.

To remind, BP and its partners made a final investment decision to expand the LNG project in 2016.

Consequently, the JV partners awarded two contracts for the onshore part and offshore segment of the project.

The onshore EPC contract was signed with a joint venture led by the Indonesian contractor Tripatra with, Chiyoda, Saipem and Suluh Ardhi Engineering. The offshore contract went to Italy’s Saipem.

Besides BP, the other partners in Tangguh are MI Berau (16.30%), CNOOC Muturi (13.90%), Nippon Oil Exploration (Berau) (12.23%), KG Berau Petroleum (8.56%), KG Wiriagar Petroleum Ltd (1.44%) and Indonesia Natural Gas Resources Muturi Inc. (7.35%).

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago