Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›New Fork River Restoration Project on the Way
Dredging

February 23, 2018 · about 8 years ago

New Fork River Restoration Project on the Way

The Bureau of Land Management (BLM) Pinedale Field Office and the Wyoming Game and Fish Department (WGFD) are proposing a project that will improve stream and riparian habitat and boating access on the New Fork River near Pinedale. The restoration project is located on the New Fork River at the “old

2 minutes read
  • LinkedIn
  • X
  • Email

The Bureau of Land Management (BLM) Pinedale Field Office and the Wyoming Game and Fish Department (WGFD) are proposing a project that will improve stream and riparian habitat and boating access on the New Fork River near Pinedale.

The restoration project is located on the New Fork River at the “old” boat ramp site referred to as the “Gas Well Site.”

BLM and WGFD staff are developing the environmental assessment, which will analyze any impacts of this project. The New Fork River Habitat Restoration and Boat Access project would improve boat access and improve stream and riparian habitat. Fish habitat would be improved by increasing pool habitat and diversity in the river by creating a narrower and deeper river and by decreasing river bank erosion, reported the BLM.

The restoration work is divided in two phases. Phase one includes reconstruction of the boat access site, addressing riparian habitat and erosion issues immediately upstream and downstream of the boat access.

The second phase will address the remaining river and riparian habitat issues within the two-mile segment of the river. Some of the proposed work includes using trees with roots attached as anchors along the riverbank, decreasing the slope of eroding banks, and planting sedges, grasses, willows, and other vegetation to increase stability to the streambank and deflect water from the bank. Other improvements include rerouting short segments of the stream channel, increasing the number of pools, and fencing to protect treated areas.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free