Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Kongsberg Dynamic Simulator for BP’s Mad Dog Phase 2
Business & Finance

March 12, 2018 · about 8 years ago

Kongsberg Dynamic Simulator for BP’s Mad Dog Phase 2

BP has awarded Kongsberg Digital a contract to design, engineer, build, install, and perform acceptance testing of a custom-built multi-purpose dynamic simulator (MPDS) for the Mad Dog Phase 2 project in the Gulf of Mexico. Kongsberg’s digital twin models will be connected to the Mad Dog 2 facility-

1 minutes read
  • LinkedIn
  • X
  • Email

BP has awarded Kongsberg Digital a contract to design, engineer, build, install, and perform acceptance testing of a custom-built multi-purpose dynamic simulator (MPDS) for the Mad Dog Phase 2 project in the Gulf of Mexico.

Kongsberg’s digital twin models will be connected to the Mad Dog 2 facility-integrated control and safety systems to create a realistic simulation environment that will deliver vital decision support for optimizing production efficiency. Applications of the simulator will include engineering studies, validation of process design, procedure validation, control system verification, and operator training.

The simulator will be built with Kongsberg’s dynamic process modeling software, K-Spice, and transient multiphase flow software, LedaFlow. The simulator model will encompass all of Mad Dog 2’s oil and gas and subsea systems, including all producing wells for water and gas injection, gas dehydration and regeneration, flare systems including systems for flare gas recovery, fuel gas, produced water and seawater, heating and cooling medium, and identified critical chemical injection systems.

The fully built and functional simulator is scheduled for delivery at least one year before first oil. This will allow ample time to train the operators and ensure competency in a facility operations context. It will also contribute to safe commissioning and start-up.

Kongsberg Digital has previously provided, and continues to maintain and support, multi-purpose dynamic simulators for other BP platforms in the Gulf of Mexico including Mad Dog, Atlantis, Na Kika, and Thunder Horse.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & TendersResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free