Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Dredging Part of the River Ver Project
Dredging

March 21, 2018 · about 8 years ago

Dredging Part of the River Ver Project

An ambitious project to return the River Ver to its more natural state as it runs through the center of St Albans has been launched, according to the City and District Council. The plan will include significant enhancements to Verulamium Park and the water quality of its artificial lakes. Major impr

2 minutes read
  • LinkedIn
  • X
  • Email

An ambitious project to return the River Ver to its more natural state as it runs through the center of St Albans has been launched, according to the City and District Council.

The plan will include significant enhancements to Verulamium Park and the water quality of its artificial lakes.

Major improvements will also be made to the surrounding wildlife and landscape including the creation of accessible wetlands teeming with birds, fish and insects as well as plants.

Initial work is due to start in 2019 once the precise cost – likely to be a seven-figure sum – is established. It will take several years to complete with funding expected to come from several sources.

The main aim is to improve a 2.5 kilometer section of the rare chalk stream that flows through the park to Sopwell Mill Farm. This will involve narrowing the Ver at some points after it enters the park to improve the flow, and create riffles, pools and meanders. The gravel bed will be naturally cleared of silt.

The river’s concrete banks will be dismantled and replaced by soil, grasses and plants. Another major development will see part of the chalk stream follow its more natural course after it passes the gardens of St Michael’s Manor. It will sweep down to the lower ground with the larger of the two lakes being reshaped to make room for it.

The park’s artificial lakes – built in the 1930s – have become heavily-silted, reducing the water quality and causing unsightly algal blooms in the summer months. A number of improvements will be made during the project including dredging of the sediment.

A wetlands area will be created at the south-west corner of the large lake which will support many different colorful plants and animals. Sediment which has built up in the bottom of the lakes will be used to provide fertile material for the new planting areas.

In another initiative, the main islands on the larger lake will be extended and raised to create better conditions for herons. In the events meadow further south, it is planned to create two more wetlands with boardwalks.

Further downstream, a change to the course of the River Ver as it reaches the Cottonmill allotments is planned.

The project is being developed by the Environment Agency, St Albans City and District Council, which owns the park, and other partners.

[mappress mapid=”24993″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free