Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›First Rentel Nacelles Arrive at Ostend
News

March 23, 2018 · about 8 years ago

First Rentel Nacelles Arrive at Ostend

First nacelles for the offshore wind turbines that will spin at the Rentel wind farm have arrived at the REBO site in Ostend, Belgium, after being shipped from the Siemens Gamesa factory in Cuxhaven.

1 minutes read
  • LinkedIn
  • X
  • Email

First nacelles for the offshore wind turbines that will spin at the Rentel wind farm have arrived at the REBO site in Ostend, Belgium, after being shipped from the Siemens Gamesa factory in Cuxhaven.

The first batch of the total of 42 nacelles has been transported by the roll on/roll off (Ro-Ro) vessel Rotra Vente, making Siemens Gamesa’s Ro-Ro logistics concept fully functional.

The D7 nacelles are 22 meters long, 6.5 meters tall, and weigh around 400 tonnes including the transportation frame.

The load-out from the installation vessel, as well as tower assembly activities are now underway at the REBO site.

Offshore installation of the wind turbines is scheduled to start in early May. The first turbines are expected to deliver power to the grid by mid-2018, with full commissioning scheduled by the end of 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free