Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USACE Extends RFI Response Date for Flood Pool Excavation
Dredging

March 28, 2018 · about 8 years ago

USACE Extends RFI Response Date for Flood Pool Excavation

The U.S. Army Corps of Engineers, Galveston District, has posted an extension on the response date for a special notice synopsis regarding a Request for Information (RFI) for Excavation and Removal of Soil from Flood Pool to May 4, 2018. USACE’s Galveston District is evaluating the level of interest

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Galveston District, has posted an extension on the response date for a special notice synopsis regarding a Request for Information (RFI) for Excavation and Removal of Soil from Flood Pool to May 4, 2018.

USACE’s Galveston District is evaluating the level of interest from government, industry, and others parties for the excavation and removal of geologically deposited soils within the flood pool of Addicks and Barker reservoirs in Harris and Fort Bend counties, Texas.

The concept of the potential project is to allow for the beneficial use of these materials by interested parties while increasing reservoir storage capacity of the Government project, said USACE.

Dr. Edmond Russo, deputy district engineer for Programs and Project Management , indicated that the intent of this RFI is to better understand the level of interest and potential of offering materials from within the reservoirs for use in regional development while simultaneously increasing storage capacity.

“This information is being collected for use in a Buffalo Bayou and Tributaries Project Flood Risk Management Improvement Study, which is authorized under Sec 216 of the Flood Control Act of 1970 ,” said Russo. “ Harris County Flood Control District has expressed interest to be the Non-Federal Cost Share Sponsor of the study, and is their highest priority in partnering with the Corps on Integrated Water Resources Management.”

The study is proposed to be advanced in tandem with a Metropolitan Houston Regional Watershed Assessment, which is authorized under Sec 729 of the Water Resources Development Act of 1986, as amended.

The HCFCD has expressed interest to cost share the assessment.

According to USACE, the study and assessment await new start appropriations to begin, and would be advanced if funded in an integrated manner to reduce flood risks and improve resiliency of the Metropolitan Houston region.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free