Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Port of Kalama Dredging Plans on the Table
Dredging

March 29, 2018 · about 8 years ago

Port of Kalama Dredging Plans on the Table

The Port of Kalama has submitted a request to modify their existing U.S. Army Corps of Engineers permit (NWP-1994-462/1) in order to provide additional in-water dredge material disposal sites and beach nourishment sites for their maintenance dredging operations. The existing Corps permit authorizes

1 minutes read
  • LinkedIn
  • X
  • Email

The Port of Kalama has submitted a request to modify their existing U.S. Army Corps of Engineers permit (NWP-1994-462/1) in order to provide additional in-water dredge material disposal sites and beach nourishment sites for their maintenance dredging operations.

The existing Corps permit authorizes maintenance dredging at the terminals to -48 Columbia River Datum (CRD) with a 2-foot over dredge allowance at North Port and TEMCO and to -43 CRD with a 2-foot over dredge allowance at Kalama Export as well as maintenance dredging at the marina to -10 +3 CRD.

The existing permit also includes placement of the dredged material at approved Port-owned sites and for reuse at the Ross Island Sand and Gravel disposal site in Portland, Oregon, and placement of dredged material at a deep scour hole associated with Oregon pile dike 77.5 via flow-lane placement and at the Port’s shoreline park (Louis Rasmussen Day Use Park) at RM 76.

According to the Corps, there are four locations associated with the proposed modification:

Dredged material disposal at the above listed in-water disposal sites would be dredged from the Port of Kalama’s North Port, TEMCO, Kalama Export, and marina facilities; located along the Columbia River, river mile 72-76.

The deadline for sending comments on the proposed work is April 20, 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free