Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Equipment›VIDEO: Johan Sverdrup sports new jacket
Equipment

April 16, 2018 · about 8 years ago

VIDEO: Johan Sverdrup sports new jacket

Statoil has installed a drilling platform jacket on the Johan Sverdrup field development located in the North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email

Norwegian oil and gas major Statoil has installed a drilling platform jacket on the Johan Sverdrup field development located in the North Sea.

Statoil last Friday launched a video of the jacket installation, which was performed “during spring 2018.” This is now the second visible structure on the Johan Sverdrup field.

Built by Kvaerner’s Verdal yard in Norway, the 21,300 tonne heavy drilling platform jacket was named Vilje in March. Vilje was the second jacket to be built by Kvaerner for the giant Sverdrup development.

The first one, for the riser platform, was completed in June 2017 and named Aegir . It was installed on the field last year using the Thialf crane vessel owned by Heerema Marine Contractors.

According to Statoil, the next step in its Sverdrup 2018 campaign entails installation of the riser platform topside, which will be the first topside on the field. This will be followed by more than 400 km of pipelines and 200 km of power cables.

As previously reported by Offshore Energy Today, t opsides for the drilling and riser platforms are currently at Aibel’s yard in Haugesund undergoing final preparations before sailaway to the field.

The riser platform is expected to head to the field later this month and the drilling platform will leave the yard in the turn of the month May/June.

The Statoil-operated Johan Sverdrup field will be developed in phases. The first phase involves the establishment of a field center consisting of four platforms, including a utility and living quarters platform, a processing platform, a drilling platform and a riser platform. The platforms will be interlinked by gangways.

Production start-up is scheduled for end 2019 with production capacity estimated at 440,000 barrels of oil per day.

The plan for development and operation (PDO) for phase 2 will be submitted before September 2018. Phase 2 is expected to start up in 2022, with full field production estimated at 660,000 barrels of oil per day.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free