Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Transformers Land on Norther Topside (VIDEO)
Wind Farms

April 24, 2018 · about 8 years ago

Transformers Land on Norther Topside (VIDEO)

Norther N.V. has shared a video showing the transformers being lifted into the Offshore High Voltage Station (OHVS) for the Norther offshore wind farm located in the Belgian North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

Norther N.V. has shared a video showing the transformers being lifted into the Offshore High Voltage Station (OHVS) for the Norther offshore wind farm located in the Belgian North Sea.

The OHVS topside is being fabricated at Engie Fabricom’s yard in Hoboken, Belgium.

Van Oord is the EPCI (Engineering, Procurement, Construction and Installation) contractor for the wind farm’s foundations, the OHVS, and the inter-array and export cables.

Sif and Smulders are in charge of the production of foundations and transition pieces, while Van Oord intends to deploy its offshore installation vessel Aeolus and cable-laying vessel Nexus for the transport and installation of the foundations and turbines.

The Final Investment Decision (FID) for the project was reached in December 2016, when MHI Vestas won a contract to provide 44 of its V164-8.0 MW turbines optimized to deliver a maximum output of 8.4MW.

Located some 23km from the port of Zeebrugge, the 370MW Norther offshore wind farm is scheduled for commissioning in 2019, when it will become Belgium’s largest wind farm.

The wind farm is being developed by Norther N.V., a joint venture between Elicio and Boreas with three sponsors, including Elicio NV (50%), Eneco (25%) and Mitsubishi Corporation (25%).

<span data-mce-type=”bookmark” style=”display: inline-block; width: 0px; overflow: hidden; line-height: 0;” class=”mce_SELRES_start”> </span>

Source: Norther Wind/ YouTube

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsOperations & MaintenanceStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free