Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Damen Gives Seafox 7 Some TLC
Operations & Maintenance

April 25, 2018 · about 8 years ago

Damen Gives Seafox 7 Some TLC

The 75.5-metre self-elevating jack-up Seafox 7 has undergone its second five-year survey and maintenance works at Damen Shiprepair Amsterdam (DSAm).

2 minutes read
  • LinkedIn
  • X
  • Email

The 75.5-metre self-elevating jack-up Seafox 7 has undergone its second five-year survey and maintenance works at Damen Shiprepair Amsterdam (DSAm).

The works began with high-pressure washing of the bottom, sides and spudcans, after which one of the spudcans was removed for inspection, Damen said.

Two deep well water risers were also removed and transported using SPMTs to the DSAm paint shop for blasting and repainting. Specialists arranged by the owner identified the need for some repairs on one of the risers and so it was moved to the yard for repairs before its blasting and repainting. The risers were then reinstalled using the vessel’s own crane.

In addition to the projects arising from the scheduled inspection, other works took place including works on two fresh water tanks. For the first tank, an additional manhole was fitted while the vessel was in dry dock. The second tank was also fitted with a second manhole while the original one was modified, this time while Seafox 7 was in the layby berth. Following the repairs, they underwent grinding and repainting.

Following ten days in the dry dock, Seafox 7 was refloated and moved out from the dry dock number four to berth number one for the main crane works.

To perform and test the repairs on the vessel’s 270-tonne crane, ten containers were stacked one on top of the other to form the support for the main crane boom. With the boom lowered and secured the repair works could get underway. Once the boom was repaired it was repainted.

Back in February 2018, Damen Verolme Rotterdam (DVR) shipyard carried out refit works on Seafox 5 after which the jack-up was ready to start installing wind turbines on the Merkur offshore wind farms in the German North Sea.

Photos: Damen Shiprepair

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & MaintenancePorts & Logistics

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago

Føn Energy Services secures multi-year O&M contract for Polish offshore wind farm
Business & Finance

Føn Energy Services secures multi-year O&M contract for Polish offshore wind farm

28 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago
Føn Energy Services secures multi-year O&M contract for Polish offshore wind farm
Business & Finance

Føn Energy Services secures multi-year O&M contract for Polish offshore wind farm

28 days ago