Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Luedtke Ready for Buffalo River Dredging Project
Dredging

May 7, 2018 · about 8 years ago

Luedtke Ready for Buffalo River Dredging Project

Luedtke Engineering is about to begin works on a $1.6 million multi-phase project that will remove sediment from the Buffalo River. The announcement was made last week by Congressman Brian Higgins and U.S. Army Corps of Engineers, Buffalo District Commander Lt. Col. Adam Czekanski. “Projects like th

2 minutes read
  • LinkedIn
  • X
  • Email

Luedtke Engineering is about to begin works on a $1.6 million multi-phase project that will remove sediment from the Buffalo River.

The announcement was made last week by Congressman Brian Higgins and U.S. Army Corps of Engineers, Buffalo District Commander Lt. Col. Adam Czekanski.

“ Projects like this which explore new ways to maintain and improve the environmental status of the Buffalo River play an essential role in the growing momentum along Western New York’s waterfront ,” said Congressman Higgins, a member of the Congressional Great Lakes Task Force.

“ Management of dredged sediment this year in Buffalo Harbor will serve as a model for future projects seeking to beneficially use dredged material in the Great Lakes Region. It is a testament to the hard work of our many partners and the strong support of our elected officials, ” said Lt. Col. Adam Czekanski, U.S. Army Corps of Engineers Buffalo District Commander .

“ Beginning with the Buffalo River environmental dredging in 2013, the quality of dredged sediment has improved to the point where it can now be used for ecosystem restoration within the Niagara River area of concern, and for a healthier Lake Erie.”

According to the announcement, work on the first phase of Buffalo River dredging is scheduled to begin this week, upstream of the South Park Bridge, and continue for approximately 30 days. During this phase, between 45,000 to 65,000 cubic yards will be relocated to Unity Island to facilitate a unique aquatic habitat and invasive species management project currently underway.

The Unity Island Aquatic and Riparian Invasive Species Management and Habitat Restoration Project, funded through the Great Lakes Restoration Initiative (GLRI), is a unique demonstration project focused on the removal of aquatic invasive species from Unity Island.

Phase II is scheduled to begin mid-June in the lower portion of the Buffalo River and continue through early July. Dredged sediment during this phase will be placed in Confined Disposal Facility (CDF) #4 adjacent to the former Bethlehem Steel site.

In total, the project will remove in total between 115,000 and 135,000 cubic yards of sediment from the federal channel. The harbor requires dredging approximately every two years to maintain navigable waters. Shipments passing through the harbor generate approximately $904 million in annual business revenue and support about 5,500 direct and indirect jobs.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free