Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USACE Plans to Remove Accumulated Sediment from LA River
Dredging

May 7, 2018 · about 8 years ago

USACE Plans to Remove Accumulated Sediment from LA River

The U.S. Army Corps of Engineers, Los Angeles District, has issued a Public Notice for the Draft EA for the Los Angeles River Channel Reach 5C & 6A Accumulated Material Removal Project. USACE conducted an engineering review of the Glendale Narrows in 2016 to assess the flood conveyance capacity in a

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Los Angeles District, has issued a Public Notice for the Draft EA for the Los Angeles River Channel Reach 5C & 6A Accumulated Material Removal Project.

USACE conducted an engineering review of the Glendale Narrows in 2016 to assess the flood conveyance capacity in anticipation of large rainfall associated with the predicted El Niño season. This review identified Reaches 5A, 5B, 5C and 6A of the LACDA flood risk management project as critical areas for restoring conveyance capacity.

“ The design capacity in these critical areas is a 51-year storm event or 78,000 cubic feet per second (cfs). However, the existing channel capacity in these critical areas due to vegetation and accumulated material is approximately a 7-year storm event (43,500 cfs). Of the four reaches, Reach 5C and the upstream section of Reach 6A has the greatest volume of accumulated material due to a bend in the river which causes sandbars to form against the left bank. In total, the sandbars contain approximately 40,000 cubic yards (cy) of material ,” said USACE in their release.

The main goal of this cleanup project is to remove the accumulated sediment in this river reach, and improve the conveyance capacity of the channel.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free