Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Self-Installing Turbine Prototype Takes Final Shape
Ports & Logistics

May 8, 2018 · about 8 years ago

Self-Installing Turbine Prototype Takes Final Shape

The self-installing Elican wind turbine prototype is undergoing final tests in the Spanish port of Arinaga in Gran Canaria prior to being towed to the installation site which is scheduled for the end of May, Esteyco, the developer of the project, said.

1 minutes read
  • LinkedIn
  • X
  • Email

The self-installing Elican wind turbine prototype is undergoing final tests in the Spanish port of Arinaga in Gran Canaria prior to being towed to the installation site which is scheduled for the end of May, Esteyco, the developer of the project, said.

The wind turbine’s rotor and the blades were mounted on the telescopic tower in April. Earlier in May, an auxiliary flotation system, designed to optimise the transport, installation and maintenance of the turbine, was successfully coupled to the unit after being towed from the port of Las Palmas.

”It is expected that the installation of the wind turbine at its final location will take place at the end of this month of May, subject to weather conditions and the development of the last pending tests,” Esteyco said.

The Elican project under which the self-installing turbine is being developed is funded by the European Commission and includes the construction and installation of a full-scale operative offshore wind turbine prototype in the Plocan area.

The project is carried out by a consortium led by Esteyco which also includes Siemens Gamesa, ALE Heavylift, DEWI GmbH, and Plocan.

The Elisa technology allows the turbine tower and the wind turbine to be fully assembled in port, eliminating the need for large vessels or cranes during the installation.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & LogisticsResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

13 days ago

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

14 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

13 days ago
Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

14 days ago