Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›Vos Prodect Gears Up Array Cable Hang-Offs for Deutsche Bucht
Storage

May 9, 2018 · about 8 years ago

Vos Prodect Gears Up Array Cable Hang-Offs for Deutsche Bucht

The Netherlands-based Vos Prodect Innovations is set to deliver inter-array cable hang-off systems for the Deutsche Bucht (DeBu) offshore wind farm, as part of a contract signed with Norddeutsche Seekabelwerke GmbH (NSW) in November 2017.

1 minutes read
  • LinkedIn
  • X
  • Email

The Netherlands-based Vos Prodect Innovations is set to deliver inter-array cable hang-off systems for the Deutsche Bucht (DeBu) offshore wind farm, as part of a contract signed with Norddeutsche Seekabelwerke GmbH (NSW) in November 2017.

Vos Prodect’s scope of work includes the design and delivery of wind turbine generator (WTG) and offshore substation (OSS) hang-off systems, which are expected to increase the efficiency in logistical operations.

According to the company, the hang-off systems will be delivered with a sealing system, reducing and eliminating the risk of hydrogen gases rising up from inside of the monopile due to the induced current cathodic protection (ICCP) system in the closed compartment between sea surface and airtight deck.

In February, NSW won a contract by Van Oord, the Balance of Plant contractor (BoP) for the project, to design, produce and deliver 45km of medium-voltage submarine power cables for the inter-array grid of the German wind farm.

The delivery of the cables is expected to take place in the spring next year.

Located some 95km north-west of the island of Borkum, the 252MW DeBu offshore wind farm will comprise 31 MHI Vestas V164-8.0MW turbines optimized at an output of 8.4MW.

The wind farm, owned and developed by Canada’s Northland Power, is scheduled for full commissioning in late 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago