Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Environment›Dutch Investigate Future Offshore Wind Links
Environment

May 18, 2018 · about 8 years ago

Dutch Investigate Future Offshore Wind Links

Arcadis and Pondera Consult will carry out a strategic study into the various possibilities to transport the energy from future large-scale offshore wind farms in the Dutch North Sea to the national grid.

1 minutes read
  • LinkedIn
  • X
  • Email

Arcadis and Pondera Consult will carry out a strategic study into the various possibilities to transport the energy from future large-scale offshore wind farms in the Dutch North Sea to the national grid.

The two companies will explore various ways of connecting offshore wind farms scheduled to come online by 2030. The study is being conducted on behalf of the Dutch government and in cooperation with TenneT.

It focuses on the assessment of environmental effects, costs, technology, and future-proofing. To this end, the companies will draw up an assessment framework, carry out an impact study, and create a balancing memorandum.

Apart from looking into how the offshore wind farms will connect to the Dutch grid, the study will also examine ways in which the electricity provided can be utilised and stored. The options include powering of the industry along the Dutch coast, conversion to hydrogen, and other ways of power storage.

Earlier this year, the Dutch government issued the Offshore Wind Energy Roadmap 2030 which added 7GW of offshore wind capacity to be developed in three zones in the Dutch North Sea from 2024 to 2030.

Combined with the existing plan to develop 3.5GW capacity by 2023, the Netherlands aims at having 11.5GW of operating offshore wind capacity by 2030.

Arcadis and Pondera Consult have already collaborated with TenneT on an EIA process for the grid connection at the Borssele wind farm zone.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

EnvironmentProject & TendersResearch & DevelopmentStorageTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago