Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›$3.3M for Levee Projects in the Walla Walla District
Dredging

May 23, 2018 · about 8 years ago

$3.3M for Levee Projects in the Walla Walla District

Four levees damaged during the 2017 flood season, located within the U.S. Army Corps of Engineers’ Walla Walla District area of operations, received a total of approximately $3.3 million in cumulative funding for flood-related repairs under Public Law 115-123, the Bipartisan Budget Act of 2018, sign

2 minutes read
  • LinkedIn
  • X
  • Email

Four levees damaged during the 2017 flood season, located within the U.S. Army Corps of Engineers’ Walla Walla District area of operations, received a total of approximately $3.3 million in cumulative funding for flood-related repairs under Public Law 115-123, the Bipartisan Budget Act of 2018, signed into law February 9, 2018.

These levees in the Walla Walla District, and dozens of other projects across the nation, will be funded to mitigate damages resulting from flooding or other natural disasters:

“ This supplemental funding enables us to conduct these flood-damage repairs and help keep communities safe ,” said Alan Feistner, deputy district engineer .

Currently, District staff are facilitating flood fighting work under P.L. 84-99 to address severe erosion at a location on the Heise-Roberts Levee System, reported the Corps.

A USACE contract for emergency flood fighting was expedited and awarded on Friday afternoon, May 18. As of Monday afternoon, May 20, USACE contractors have stabilized the 300-feet-long by 15-feet-wide section of levee that was eroded away by seasonal high flows in the Snake River.

In some locations, the levee had been eroded more than 20 feet in height from the top of the levee – about 8 feet of the levee is visible above the water’s surface.

Complete rehabilitation of damaged sections of the Heise-Roberts Levee System, and the other three levees identified above, is planned to occur in the near future using funding from the Bipartisan Budget Act of 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free