Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Borkum Riffgrund 2 Substation Topside Starts Rolling
Ports & Logistics

May 28, 2018 · about 8 years ago

Borkum Riffgrund 2 Substation Topside Starts Rolling

HSM Offshore has started the load-out of the offshore substation topside built for the Borkum Riffgrund 2 offshore wind farm at its yard in Schiedam, the Netherlands.

1 minutes read
  • LinkedIn
  • X
  • Email

HSM Offshore has started the load-out of the offshore substation topside built for the Borkum Riffgrund 2 offshore wind farm at its yard in Schiedam, the Netherlands.

The 2,500-tonne topside will soon be installed at the site some 38 kilometres off the island of Borkum in the German North Sea, where the jacket foundation was installed in July 2017.

HSM Offshore is carrying out this EPC contract on behalf of Ørsted, the developer of the 450MW project.

The wind farm will feature 56 MHI Vestas 8MW turbines which are currently being installed and are scheduled for commissioning in 2019.

The offshore substation will collect the electricity generated by the turbines, transform it to a higher voltage level, and feed it to the German grid.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & LogisticsStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

13 days ago

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

13 days ago
Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago