Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Jan De Nul VIDEO: Creating Extra Space in Monaco
Dredging

May 30, 2018 · about 8 years ago

Jan De Nul VIDEO: Creating Extra Space in Monaco

Jan De Nul has just released this amazing video that shows how they create extra housing and living space in the second smallest country in the world – Monaco. The project consists of three stages: dredging, rock installation and land reclamation. During the dredging stage, which lasted from April t

2 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul has just released this amazing video that shows how they create extra housing and living space in the second smallest country in the world – Monaco.

The project consists of three stages: dredging, rock installation and land reclamation.

During the dredging stage, which lasted from April to November 2017, the Envisan centre in Toulon played an important role as it had to process all polluted sediments.

Project manager, Tom Van Slambrouck , said: “In a first phase, we removed an upper layer of 60,000 m³ (about 100,000 tonnes) of polluted sediments. Obviously, the fact that we could immediately process these sediments in our specialized Envisan soil treatment center nearby was a bonus to the client. We also removed 30,000 tonnes of the existing shore protection, 120,000 m³ of remblai anthropique(construction waste dumped at sea) and 400,000 m³ of ordinary sediments.”

The second stage of the project started in December 2017.

The final goal is to install 1,600,000 tonnes of rock, which will serve as foundation for the dyke around the actual land expansion.

“ These rocks are loaded onto our fallpipe vessel Simon Stevin in the port of Fos, near Marseille, in batches of 30,000 tonnes. With these rocks, the Simon Stevin builds the foundation very accurately. When all material is in place, our client, Bouygues Travaux Publics, installs a belt of caissons or huge concrete blocks on top of it, behind where the new plot of land will be created ,” added Van Slambrouck.

[mappress mapid=”25183″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free