Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›All Set for Bowen Wharf Repair Project
Dredging

June 13, 2018 · about 8 years ago

All Set for Bowen Wharf Repair Project

North Queensland Bulk Ports Corporation (NQBP) has just announced that the maintenance works are set to begin on the Bowen Wharf this week. According to NQBP acting CEO Rochelle Macdonald, the works include repairs to cracked concrete slab sections and some of the timber decking structure and the re

1 minutes read
  • LinkedIn
  • X
  • Email

North Queensland Bulk Ports Corporation (NQBP) has just announced that the maintenance works are set to begin on the Bowen Wharf this week.

According to NQBP acting CEO Rochelle Macdonald, the works include repairs to cracked concrete slab sections and some of the timber decking structure and the removal of deteriorated timber fender piles.

“ NQBP recognizes the Bowen Wharf is a beloved public asset to the Bowen community as well as an operational asset to the Port of Abbot Point, ” Dr Macdonald said. “ Throughout these works there will be no disruptions to public access along the wharf. Most works will be happening from a barge positioned alongside the wharf.”

Local contractors Pilchers have been engaged to complete the onshore works while Townsville-based Pacific Marine Group will be completing the offshore works.

“ The safety of all users is of the upmost importance to NQBP. While the fender piles are being removed, small sections of the wharf will be temporarily closed for public safety, ” Dr Macdonald added.

There will be a total of 51 redundant fender piles removed over a two-week period, which will be transferred to a site adjacent to the Port Denison Sailing Club for storage.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free