Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Panama’s first LNG terminal receives commissioning cargo
Clean Fuel

June 14, 2018 · about 8 years ago

Panama’s first LNG terminal receives commissioning cargo

Panama’s and Central America’s first liquefied natural gas (LNG) import terminal received on Thursday a commissioning cargo the from Cheniere’s Sabine Pass plant in the US. Engie’s 154,000-cbm LNG carrier Provalys docked at Panama’s Costa Norte LNG import terminal on Thursday morning, a spokeswoman

2 minutes read
  • LinkedIn
  • X
  • Email

Panama’s and Central America’s first liquefied natural gas (LNG) import terminal received on Thursday a commissioning cargo the from Cheniere’s Sabine Pass plant in the US.

Engie’s 154,000-cbm LNG carrier Provalys docked at Panama’s Costa Norte LNG import terminal on Thursday morning, a spokeswoman for AES in Panama, one of the two developers in the project, confirmed to LNG World News in an emailed comment.

US energy company AES Corporation, through AES Colon, has a 50.1 percent stake in the $1.1 billion LNG-to-power project that includes a 380MW combined-cycle gas turbine (CCGT). The other 49.9 percent share belongs to Inversiones Bahia.

The Costa Norte LNG import terminal consists of a 180,000-cbm LNG tank, a jetty and regasification facilities. Total capacity of the LNG terminal is expected to be 1.5 million tonnes per annum (mtpa).

According to a statement by AES in Panama, Provalys will stay at the LNG import facility in Colon for about month and a half after it would be replaced by Engie’s second LNG carrier, Gaselys, which has the same characteristics.

To remind, AES signed a deal last year with France’s Engie under which the latter would supply 400,000 tons of LNG per year over a 10-year period to the Costa Norte LNG terminal.

Consequently, the duo also entered into a joint venture to sell the chilled fuel to third parties in Central America.

ASE said in the statement it expects to start commercial operations at the AES Colon power plant in the coming months.

The AES Colon power plant will use only 25 percent of the LNG terminal’s capacity, while the remaining 75 percent would be marketed for other varied uses.

These uses include conversion of power plants that currently use bunker or diesel fuel, transportation and bunkering, Miguel Bolinaga, President of AES in Panama told LNG World News in an interview in April.

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelPorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free