Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Hohe See Substation Topside Heads Home
Ports & Logistics

June 19, 2018 · about 8 years ago

Hohe See Substation Topside Heads Home

The EnBW Hohe See substation topside has left ENGIE Fabricom’s yard in Hoboken, Belgium, and is now sailing towards the installation site in the German North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email

The EnBW Hohe See substation topside has left ENGIE Fabricom’s yard in Hoboken, Belgium, and is now sailing towards the installation site in the German North Sea.

The topside left the Hoboken yard on Monday evening, 18 June. The journey is expected to last for three days. The topside will be installed by Heerema’s lifting vessel Thialf in the coming week.

With its 55 metres length and 30 metres height, its 4,500 tonnes, 3 transfomers and 3 shunt reactors, Hohe See is the biggest substation ever built on the ENGIE Fabricom Hoboken yard. Apart from ENGIE Fabricom, Smulders and CG worked on the project.

The substation will be installed on the jacket foundations built by Smulders on their site in Vlissingen in the Netherlands which was transported to its final location in the German North Sea on 29 May.

The 497MW Hohe See wind farm will feature 71 Siemens Gamesa 7MW turbines installed some 98 kilometres off the German coast. It consists of 71 turbines with 7MW capacity.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & LogisticsStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

13 days ago

Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago

Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel
Business & Finance

Concept design revealed for Port of Klaipėda’s green methanol bunkering vessel

13 days ago
Yamal LNG; Source: Novatek
Authorities & Government

EU’s Arctic LNG appetite hits new high with €5.96 billion bill for 136 Russian cargoes in H1 2026

15 days ago
Offshore wind could help create ‘electric shipping highway’ across Europe, study says
Infrastructure

Offshore wind could help create ‘electric shipping highway’ across Europe, study says

about 1 month ago