Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›BHGE scores Gorgon subsea gig from Chevron
Ports & Logistics

June 25, 2018 · about 8 years ago

BHGE scores Gorgon subsea gig from Chevron

Baker Hughes, a GE company, has been awarded a contract from Chevron Australia for the supply of subsea production equipment, under a 15-year master service order, with a second contract for well completion equipment. These technology solutions will enable a second development phase within the Great

2 minutes read
  • LinkedIn
  • X
  • Email

Baker Hughes, a GE company, has been awarded a contract from Chevron Australia for the supply of subsea production equipment, under a 15-year master service order, with a second contract for well completion equipment.

These technology solutions will enable a second development phase within the Greater Gorgon area offshore Australia, helping to maintain gas supply to the downstream LNG plant on Barrow Island in Western Australia, a BHGE statement reads.

This next phase is the first to be executed under the terms of the master service order with BHGE, signed in March 2016.

The scope of supply of the new contract includes 13 subsea production trees, two eight-slot manifolds, 13 MS-700 SFX fatigue-resistant wellheads and specialty connectors & pipes systems, and 16 Sem2K subsea control systems and associated equipment.

BHGE is also supplying well completion equipment and services under a separate five-year contract, including coring work, liner hangers, completions and wellbore cleanup technology.

The Gorgon development is one of the largest natural gas projects in the world today, and BHGE has been a key partner in this multi-stage development.

“The expanded Gorgon subsea infrastructure will continue to be supported out of BHGE’s state-of-the-art oil and gas campus in Jandakot, Western Australia, where more than $100m has been invested in significant infrastructure and engineering capabilities to service the latest technologies deployed in the development,” said Visal Leng , President for APAC at BHGE.

“An in-country team will also support testing, installation and commissioning activities and, once the second stage is brought online, will provide operational support to maintain equipment availability, along with storage and maintenance of spare parts and tooling,” Leng added.

Gorgon comprises a three-train, 15.6 million tonnes per annum LNG facility and a domestic gas plant with the capacity to supply 300 terajoules of gas per day to Western Australia.

The first LNG cargo departed Barrow Island in March 2016 and domestic gas supply to the Western Australian market started in December 2016.

The Gorgon project is operated by Chevron’s Australian unit that has a 47.3 percent share in the giant LNG project.

ExxonMobil and Shell hold 25 percent, each, in the project, while Osaka Gas has 1.25 percent, Tokyo Gas 1 percent and JERA owns a 0.417 percent share in the joint venture.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Ports & LogisticsProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

13 days ago