Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Collins, King: $11.7M for Dredging and Maintenance Projects in Maine
Dredging

June 25, 2018 · about 8 years ago

Collins, King: $11.7M for Dredging and Maintenance Projects in Maine

U.S. Senators Susan Collins and Angus King have announced that the U.S. Army Corps of Engineers released its fiscal year 2018 work plan, which includes important dredging and maintenance projects in Maine, totaling $11,780,000. The budget for the Army Corps of Engineers is overseen by the Senate Ene

2 minutes read
  • LinkedIn
  • X
  • Email

U.S. Senators Susan Collins and Angus King have announced that the U.S. Army Corps of Engineers released its fiscal year 2018 work plan, which includes important dredging and maintenance projects in Maine, totaling $11,780,000.

The budget for the Army Corps of Engineers is overseen by the Senate Energy and Water Development Appropriations Subcommittee, of which Senator Collins is a senior member.

“ We are pleased that the Army Corps of Engineers has advanced these critical dredging projects for Maine harbors and rivers, which will help address significant safety and navigational concerns for commercial fishermen as well as recreational boaters, ” said Senators Collins and King in a joint statement.

“ Maine’s waterways are the lifeblood of many coastal regions and support our state’s economy. We will continue to work with the Corps and local communities to address Maine’s other important maintenance needs.”

Some of these projects that have received funding under the Corps’ work plan are:

Funds are being used to award a fully funded base bid contract with options to perform maintenance dredging of about 140,000 cubic yards of material from the 8-foot channel and anchorage with in-river placement and beach renourishment.

Funds are being used to award a fully funded contract to perform maintenance dredging of about 42,000 cubic yards of material from the 10-foot channel and 8-foot anchorages with placement at the Cape Arundel Disposal Site.

Funds will be used for maintenance dredging.

Funds are being used to perform maintenance dredging of the 8-foot entrance channel using the government dredger Currituck. About 5,000 cubic yards of sandy material would be removed and placed at a near shore site off Wells Beach.

Funds are being used to perform annual disposal site monitoring; including condition surveys, sediment sampling and testing, repositioning of disposal site buoys and preparation of several monitoring study reports.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free