Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Plan for Long Island Sound Groin Reconstruction on Display
Dredging

June 27, 2018 · about 8 years ago

Plan for Long Island Sound Groin Reconstruction on Display

Permit applicant Mark Lender is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with placing stones to reconstruct a groin in Long Island Sound, Clinton, Conn. The proposed work involves the placement of 80 cubic yard

2 minutes read
  • LinkedIn
  • X
  • Email

Permit applicant Mark Lender is seeking a permit from the U.S. Army Corps of Engineers, New England District, to conduct work in waters of the U.S. in conjunction with placing stones to reconstruct a groin in Long Island Sound, Clinton, Conn.

The proposed work involves the placement of 80 cubic yards of stone into a 360-square-foot area of Long Island Sound in order to reconstruct a groin that was originally constructed sometime in the early 1900s, but is not currently serviceable and is in disrepair.

The original groin was approximately 50 feet long by 6 to 8 feet wide, but has been displaced and at present covers a 900-square-foot area. The reconstructed groin is proposed to match the original footprint but also extend an additional 10 feet into Long Island Sound. The proposed groin will begin at the existing seawall and extend 60 feet waterward.

According to USACE, the proposed groin will be approximately 6 feet wide and range in elevation above the substrate from 3.5 feet to 6 feet.

The permit applicant stated that the groin is capable of protecting adjacent residences while not preventing sediment from moving to the other local beaches.

Additionally, the applicant has stated that the groin will maximize the width of the beach in front of the residences it protects, while not significantly impacting neighboring beaches.

Public comments on this work should be forwarded no later than July 26, 2018 to the U.S. Army Corps of Engineers, New England District.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free