Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Peter Madsen Rederi Wraps Up Horns Rev 3 Gig
Offshore Wind

July 12, 2018 · about 8 years ago

Peter Madsen Rederi Wraps Up Horns Rev 3 Gig

Denmark-based marine contractor Peter Madsen Rederi A/S (PMR) has completed the construction of a new set of stone beds in the Port of Esbjerg for the load-out of turbines destined for the Horns Rev 3 offshore wind farm.

1 minutes read
  • LinkedIn
  • X
  • Email

Denmark-based marine contractor Peter Madsen Rederi A/S (PMR) has completed the construction of a new set of stone beds in the Port of Esbjerg for the load-out of turbines destined for the Horns Rev 3 offshore wind farm.

According to PMR, the stone beds will be used as a stable platform for the jack-up installation vessel and were required to be installed in time for the first turbine load-out.

The project included capital dredging of approximately 30,000m3 of the seabed, dumping of the material offshore, procurement, transport handling and installation of around 20,000m3 of stones, as well as extensive multibeam surveying.

“Building on vast experience from similar projects, we executed the project ahead of schedule in less than a month,” said Michael Normann , CEO at PMR.

Fred. Olsen Windcarrier’s jack-up Brave Tern recently arrived in Esbjerg to load out the first set of turbine components to be installed at the 406.7MW project.

Located off the Danish west coast, the Horns Rev 3 offshore wind farm will comprise 49 MHI Vestas 8.3MW turbines installed on monopile foundations.

Vattenfall, the developer of the project, expects to commission the wind farm in 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindOperations & MaintenancePorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free