Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Three-Legged Dozen at East Anglia One
News

July 27, 2018 · about 8 years ago

Three-Legged Dozen at East Anglia One

Van Oord has started the next campaign to install jacket foundations at East Anglia One wind farm offshore Suffolk, UK, with twelve of the units now already in place.

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord has started the next campaign to install jacket foundations at East Anglia One wind farm offshore Suffolk, UK, with twelve of the units now already in place.

The Dutch contractor installed the first of the 102 three-legged jackets at the site some 45 kilometres southeast of Lowestoft mid-June. The jackets are being installed in depths of up to 55 metres. East Anglia One will have the largest number of three-legged foundations ever installed on a wind farm, Van Oord said.

ScottishPower Renewables commissioned Van Oord to function as the contractor for this project, responsible for transport and installation of the offshore wind turbine foundations, including logistics and deployment of the equipment.

Heavy lift vessel Aegir started its assignment to place jackets from the transport barges on to the pre-installed piles last week. It is anticipated to perform a number of distinct campaigns over the late summer and autumn of 2018, the company said.

With a total of 102 Siemens 7MW wind turbines, East Anglia ONE wind farm will ultimately deliver a total of 714MW. The wind farm is scheduled to become operational in 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free