Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Yamal LNG ships 4 million tons since start of deliveries
News

August 29, 2018 · about 8 years ago

Yamal LNG ships 4 million tons since start of deliveries

Novatek-operated Yamal LNG project in the Russian Arctic has reached a milestone shipping four million tons of liquefied natural gas.

1 minutes read
  • LinkedIn
  • X
  • Email

Novatek-operated Yamal LNG project in the Russian Arctic has reached a milestone shipping four million tons of liquefied natural gas.

The project reached the four million figure as it loaded the 54th cargo since the first train has been commissioned in December 2017.

Currently, there are two LNG trains in operation with a total capacity of 11 million tons per annum, and both LNG trains have reached design capacity, Novatek said.

First cargo from the second liquefaction train was shipped earlier this month, six months ahead of its original schedule.

The commissioning works on the third train were ongoing, Novatek said in its statement.

At full build-out, the project will have the capacity to produce 17.4 mtpa of LNG from three 5.5 mtpa trains and a fourth train capable of producing 900,000 tons of LNG per year, utilizing the hydrocarbon resources of the South-Tambeyskoye field on the Yamal peninsula.

Novatek is partnered on the project by France’s Total, China’s CNPC and Silk Road Fund.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free