Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Canaveral Port Authority Board Okays Agreement with Carnival
Shipbuilding

August 30, 2018 · about 8 years ago

Canaveral Port Authority Board Okays Agreement with Carnival

Carnival’s new 180,000-ton ship will homeport at Port Canaveral’s new Cruise Terminal 3.

2 minutes read
  • LinkedIn
  • X
  • Email

The Canaveral Port Authority (CPA) Board of Commissioners have approved the terms of a long-term agreement with Carnival Cruise Line, paving the way for Carnival to homeport its newest and largest ship at the port.

The new operating agreement, which begins September 1, 2018, and replaces an existing six-year agreement set to expire next year, provides a 25-year primary term with four additional five-year renewal options.

Under the terms of the agreement, Carnival’s minimum annual guarantee increases from the current fixed USD 7 million passenger fee to USD 14.5 million with annual escalators.

“This agreement is a valuable milestone for the port’s cruise business and a foremost achievement for the entire region’s economy,” Tom Weinberg, Secretary/Treasurer, Canaveral Port Authority Board of Commissioners, commented.

Canaveral Port Authority and Carnival Cruise Line will invest in building and equipping a new two-story 185,000-sq. ft. terminal to accommodate the as-yet-unnamed 180,000-ton Carnival Cruise Line ship, engineered with LNG “green cruising” design platform.

To be built at Meyer Werft in Finland, the new cruise vessel will have a 5,286 lower berth capacity with a maximum capacity of approximately 6,500 passengers.

“The most exciting aspect, and the reason a new terminal is necessary, is that this groundbreaking new class of ship – the largest ever constructed for Carnival Cruise Line – will be home ported at Port Canaveral when it’s delivered in 2020. This ship, which can carry up to 6,500 passengers will be the first LNG-powered cruise ship based in North America,” Capt. John Murray, Port CEO, commented.

Constructing the new CT-3 terminal, plus an adjacent elevated parking facility to accommodate nearly 1,800 vehicles, and related wharf, road and access improvements will total USD 150 million – estimated to be the largest single project in the history of the port. The new terminal is planned for completion by June 2020.

The arrival of the new Carnival ship in 2020 will mark 30 years that Carnival Cruise Line has been sailing from Port Canaveral, the longest of any of the port’s cruise partners.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free