Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›TenneT Starts Laying NordLink Subsea Cables
Storage

September 3, 2018 · about 8 years ago

TenneT Starts Laying NordLink Subsea Cables

Transmission system operator TenneT has begun laying its NordLink subsea cable section in the German North Sea.

2 minutes read
  • LinkedIn
  • X
  • Email

Transmission system operator TenneT has begun laying its NordLink subsea cable section in the German North Sea.

Over the coming weeks, TenneT will wind out 99 kilometres into the seabed between the cable landfall at the Büsum dike, Schleswig-Holstein, and southwest of the Island of Sylt through the tidal flat area in the Wadden Sea.

Next year, another 55 kilometres of subsea cable will be laid in the German offshore area up to the border of the Danish territorial waters. Here, the cable end will be connected to the 228-kilometre-long cable section to be laid in 2018 and 2019 in the Danish North Sea area by means of a subsea cable joint. The 134-kilometre-long subsea cable section in Norwegian territorial waters is already complete.

Construction of the 53-kilometre-long overhead line on Norwegian mainland is scheduled for completion in 2019. On German mainland, NordLink will be laid as an underground cable on a 54-kilometre route between Büsum dike and the Wilster converter station in the Steinburg district starting in 2019.

The 1,400MW NordLink interconnector is 623 kilometres long and will directly connect the energy markets of Germany and Norway for the first time and serve as an exchange between German wind energy and Norwegian hydropower.

The NordLink project is being implemented by the Norwegian TSO Statnett and DC Nordseekabel GmbH & Co. KG, each with 50% ownership. TenneT and KfW each have a 50% share in DC Nordseekabel. DC Nordseekabel is responsible for the construction and approvals on the German part of the project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Storage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago

EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dorian LPG takes over newbuild dual-fuel LPG and ammonia gas carrier
Business & Finance

Norwegian CO2 transport and storage project gathers three industry majors

about 2 months ago
EnergyPathways launches offshore wind-linked compressed air energy storage project
Infrastructure

EnergyPathways launches offshore wind-linked compressed air energy storage project

about 3 months ago