Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Twenty Turbines Installed at Beatrice
News

September 25, 2018 · about 8 years ago

Twenty Turbines Installed at Beatrice

Swire Blue Ocean’s Pacific Orca has installed 20 out of 84 Siemens Gamesa 7MW turbines at the Beatrice offshore wind farm in the Outer Moray Firth, Scotland.

1 minutes read
  • LinkedIn
  • X
  • Email

Swire Blue Ocean’s Pacific Orca has installed 20 out of 84 Siemens Gamesa 7MW turbines at the Beatrice offshore wind farm in the Outer Moray Firth, Scotland.

The wind turbine installation vessel erected the first turbine at the offshore site some 13km off the Caithness coast in mid-July, which was shortly followed by the delivery of first power to the UK National Grid.

Pacific Orca loads the turbine components in sets of five at the Nigg port, Siemens Gamesa’s pre-assembly base. The commissioning takes place immediately after each turbine is installed and is carried out using a combination of walk-to-work vessel Island Crown and crew transfer vessels Fob Swath 3 and Seacat Resolute.

The 588MW Beatrice offshore wind farm is scheduled for full commissioning in spring 2019.

The project is being developed by Beatrice Offshore Windfarm Limited (BOWL), a joint venture partnership between SSE, Copenhagen Infrastructure Partners, and Red Rock Power Ltd.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free