Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›LNG›US FERC issues positive FEIS for Venture Global’s Calcasieu Pass LNG project
LNG

October 23, 2018 · about 8 years ago

US FERC issues positive FEIS for Venture Global’s Calcasieu Pass LNG project

The United States Federal Energy Regulatory Commission (FERC) has issued a final environmental impact statement for Venture Global LNG’s Calcasieu Pass project and related pipeline infrastructure in Cameron Parish, Louisiana. Venture Global LNG is developing a liquefaction and export facility with 1

1 minutes read
  • LinkedIn
  • X
  • Email

The United States Federal Energy Regulatory Commission (FERC) has issued a final environmental impact statement for Venture Global LNG’s Calcasieu Pass project and related pipeline infrastructure in Cameron Parish, Louisiana.

Venture Global LNG is developing a liquefaction and export facility with 12 million tonnes per annum of LNG production capacity.

“The FERC staff concludes that construction and operation of the project would result in some adverse environmental impacts, but these impacts would be reduced to less-than-significant levels,” FERC said in the statement.

FERC said that its commissioners will take the FERC staff’s recommendations into consideration when they make a decision on the project. However, FERC did not say when the commissioners would make that decision.

The Calcasieu Pass project includes two LNG storage tanks, each with a capacity of about 200,000 cubic meters, and a 720-megawatt electricity generating plant.

Venture Global is developing both the Calcasieu Pass facility on the Gulf of Mexico and the 20 mtpa Plaquemines LNG facility on the Mississippi River due to be completed in 2022 and 2023 respectively.

Worth mentioning here, the company recently entered into an agreement to supply Polish Oil and Gas Co (PGNiG) with LNG for 20 years starting in 2022.

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

LNGPorts & Logistics

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free