Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›City of Ventura to Renew Maintenance Dredging Permit
Dredging

October 26, 2018 · about 8 years ago

City of Ventura to Renew Maintenance Dredging Permit

The City of Ventura has proposed to renew their existing permit for the maintenance dredging of the Ventura Keys. According to the Corps, the City calls for the renewal of the existing permit to maintenance dredge up to 350,000 cubic yards of material over a ten-year period, not exceeding 100,000 cu

1 minutes read
  • LinkedIn
  • X
  • Email

The City of Ventura has proposed to renew their existing permit for the maintenance dredging of the Ventura Keys.

According to the Corps, the City calls for the renewal of the existing permit to maintenance dredge up to 350,000 cubic yards of material over a ten-year period, not exceeding 100,000 cubic yards of material per year.

The proposed project is required to maintain channel configurations, and to restore and assure safe navigability within the Keys waterways, providing material for beach replenishment, reported the Corps.

Deposition options include the surf zone at Cell 1 of the Pierpont Bay Groin Field (the first cell north of Marina Park) and the surf zone at the mouth of the Santa Clara River and/or the near shore waters at the mouth of the Santa Clara River.

USACE also added that the dredging and deposition activities would not commence until after Labor Day in September of any year and would cease on or before March 15 of the following year so as to avoid impacts on grunion spawning, least tern and snowy plover nesting, and recreational use of the beach.

The three channels in the City will be dredged to a depth of -12 feet MLLW plus a two-foot overdredge. It is anticipated that the channels would require dredging one or two times over the ten-year maintenance period.

The deadline for sending comments on the proposed work is November 25, 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free