Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›PHOTO: Keeping Rock Island District’s Navigation Channel Open
Business & Finance

November 7, 2018 · about 7 years ago

PHOTO: Keeping Rock Island District’s Navigation Channel Open

Almost 1.4 million cubic yards, or 70,000 semitrailer loads – that’s the amount of material the Dredge Goetz has removed from the navigation channel in the Rock Island District over the last five years. This figure represents only a fraction of the total amount that has been dredged by the Goetz thr

2 minutes read
  • LinkedIn
  • X
  • Email

Almost 1.4 million cubic yards, or 70,000 semitrailer loads – that’s the amount of material the Dredge Goetz has removed from the navigation channel in the Rock Island District over the last five years.

This figure represents only a fraction of the total amount that has been dredged by the Goetz throughout the St. Paul, Rock Island and St. Louis Districts combined since 2013.

The Goetz, based out of the St. Paul District, spent much of August and September in the Rock Island District, working in Pools 12 and 20.

For those who don’t know exactly how this hydraulic dredge works, or the purpose of dredging the navigation channel, Adrian Loewenhagen, Assistant Captain of the Dredge Goetz , has a simple explanation: “It’s like a blender attached to a vacuum cleaner hose. It stirs up the bottom and sucks it up and discharges it to wherever the authorized site is.”

As for why dredging the channel is needed, that comes down to the navigation mission and the challenges put in place by a water source as powerful as the Mississippi River.

In order to maintain a 9-foot navigation channel, material that settles in the main channel must be removed. This material, such as sand, soil and decomposing vegetation, is constantly moving around in the river and often settles into the channel as the current moves it downstream.

During dredging, the material is removed from the channel and is set aside for a variety of uses including habitat development, wetland creation, aquatic habitat enhancement, winter road maintenance, levee repair and improvement, aggregate for concrete, bank protection and general purpose fill.

Story by James Finn The U.S. Army Corps of Engineers, Rock Island District

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceVessels

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free