Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Whitehill Road Coastal Protection Works About to Begin
Dredging

November 8, 2018 · about 7 years ago

Whitehill Road Coastal Protection Works About to Begin

Construction of two low-crest Geotextile Sand Container (GSC) groynes on the Drummond Cove Foreshore to mitigate coastal erosion at Whitehill Road will begin next week, reports the City of Greater Geraldton. The two 40m long groynes, which will extend across the beach and into the ocean, have been d

1 minutes read
  • LinkedIn
  • X
  • Email

Construction of two low-crest Geotextile Sand Container (GSC) groynes on the Drummond Cove Foreshore to mitigate coastal erosion at Whitehill Road will begin next week, reports the City of Greater Geraldton.

The two 40m long groynes, which will extend across the beach and into the ocean, have been designed to retain sand at Whitehill Road and reduce reliance on temporary sand nourishment operations.

The City Mayor, Shane Van Styn, said that the use of GSC revetments aligns with the community’s values regarding our coastline.

“ By utilizing GSCs the beach can still be enjoyed and at any stage in the future should the GSC revetments no longer be needed they can be easily removed. Implementing this option demonstrates the City’s commitment to work collaboratively with the local community on addressing the challenges of coastal erosion ,” he said.

This adaption measure is consistent with the City’s Draft Coastal Hazard Risk Management and Adaptation Plan (CHRMAP), which was based on the requirements and adaptation hierarchy of Western Australia’s State Planning Policy No. 2.6 – State Coastal Planning Policy (SPP2.6).

Construction of the groynes will be undertaken by local contractor Red Dust Holdings with MP Rogers and Associates providing technical services. Works are scheduled to begin on Monday, 12 November, 2018 and estimated to be completed before Christmas.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free