Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›TEPCO Starts Seabed Survey for Potential Japanese Offshore Wind Farm
Operations & Maintenance

November 12, 2018 · about 7 years ago

TEPCO Starts Seabed Survey for Potential Japanese Offshore Wind Farm

Tokyo Electric Power Company (TEPCO) has started a seabed survey offshore Japan to ascertain the bedrock structure of the seabed for a possible offshore wind farm. The survey is conducted off the coast of municipalities of Choshi, Asahi, Sosa and Yokoshibahikari in Chiba Prefecture. The boring surve

2 minutes read
  • LinkedIn
  • X
  • Email

Tokyo Electric Power Company (TEPCO) has started a seabed survey offshore Japan to ascertain the bedrock structure of the seabed for a possible offshore wind farm.

The survey is conducted off the coast of municipalities of Choshi, Asahi, Sosa and Yokoshibahikari in Chiba Prefecture.

The boring survey will last until the end of January 2019. TEPCO will also conduct sonic prospecting offshore of the municipalities of Choshi, Asahi, Sosa and Yokoshibahikari in the same period.

TEPCO is moving forward with domestic and overseas offshore wind power projects and overseas hydroelectric power projects, aiming to develop renewable energy sources as primary sources of power. The company’s target is eventually to produce two to three million kilowatts (kW) of power from its domestic offshore wind power projects.

TEPCO began conducting offshore research off the coast of Choshi in August 2009 under a public initiative organized by the New Energy and Industrial Technology Development Organization (NEDO). In the years since, TEPCO has surveyed weather conditions, sea life and the potential environmental impact of offshore structures in the area.

Also, since January 2013, TEPCO and NEDO have been testing Japan’s first offshore wind power generation facility, a fixed-foundation offshore turbine with a rated power of 2,400 kW, located 3.1 km south of Choshi.

The test has provided TEPCO with valuable experience in facility operation and maintenance as well as equipment safety and resistance to corrosion and other conditions. As a result, TEPCO has confirmed that the fairly shallow depths and high winds along the Chiba coast offer excellent conditions for an offshore wind farm.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago

FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount
Business & Finance

Offshore Energy Amsterdam 2026 opens early bird ticket sales with 25% discount

about 2 months ago
FPSO Cidade de Itajai is operating on the Baúna field - Karoon
Business & Finance

Brazilian oil project back in production mode after 28-day shutdown

about 2 months ago