Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Photo of the Day: Norther Towers Over Vlissingen
News

November 14, 2018 · about 7 years ago

Photo of the Day: Norther Towers Over Vlissingen

The assembly of the wind turbine towers destined for the Norther offshore wind farm has begun at the Port of Vlissingen, the Netherlands.

1 minutes read
  • LinkedIn
  • X
  • Email

The assembly of the wind turbine towers destined for the Norther offshore wind farm has begun at the Port of Vlissingen, the Netherlands.

The project will comprise a total of 44 MHI Vestas V164-8.0 MW turbines, optimized to deliver a maximum output of 8.4MW.

Offshore works began in May with the installation of scour protection at the site some 23km off the port of Zeebrugge in Belgium.

Van Oord’s vessel Aeolus kicked off the installation of the monopile foundations at the beginning of August, which was shortly followed by the installation of the substation .

The 370MW wind farm is scheduled for commissioning in the third quarter of 2019 when it will become the largest offshore wind farm in Belgian waters.

Norther NV, a partnership between Elicio and Boreas – a joint venture between Eneco and Diamond Generating Europe, is responsible for the development, the installation and the operation of the project.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free