Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Inch Cape Picks NKT and Boskalis for Export Cable Work
Project & Tenders

November 19, 2018 · about 7 years ago

Inch Cape Picks NKT and Boskalis for Export Cable Work

The consortium of NKT and Boskalis Subsea Cables & Flexibles has signed a Pre-Construction Agreement (PCA) for the delivery and installation of an export cable system for the 784MW Inch Cape offshore wind project in the UK.

2 minutes read
  • LinkedIn
  • X
  • Email

The consortium of NKT and Boskalis Subsea Cables & Flexibles has signed a Pre-Construction Agreement (PCA) for the delivery and installation of an export cable system for the 784MW Inch Cape offshore wind project in the UK.

The project is being developed by Inch Cape Offshore Wind Farm Ltd, a subsidiary of Red Rock Power Ltd.

The PCA nominates the consortium as the exclusive supplier and installer for the export cable system. Furthermore, the PCA is a key step towards a final order which is conditional upon final contract negotiations and the project owners providing NKT a notice to proceed.

These milestones are expected during the second half of 2020 if the project is successful in the next UK Contracts for Difference (CfD) auction, which is likely to take place in the second quarter of 2019.

The Inch Cape project will comprise the manufacture of approximately 170 kilometres of 220 kV AC offshore export cables at one of NKT’s two high-voltage power cable plants, as well as the installation by Boskalis.

Such type of project typically has a NKT contract value in the range of EUR 80-120m (DKK 600-900m) in market prices, equivalent to a range of EUR 70–110m (DKK 520-820m) in standard metal prices, NKT said.

Conditional on the abovementioned steps, the cables will be delivered for installation in 2022-2023.

”Being the exclusive supplier of the export cable systems for the prospective Inch Cape offshore wind, confirms our forefront market position in the offshore wind segment. Furthermore, the current activity level within offshore wind supports our view that the business is picking up again on project awards and realization,” NKT Interim CEO Roland M. Andersen said.

The 784MW Inch Cape will consist of up to 72 turbines located at an area of approximately 150km2 some 15km off the Angus coastline in Scotland.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & TendersStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

WATCH: Floating solar platform installed in Valencia
Business & Finance

WATCH: Floating solar platform installed in Valencia

12 days ago
Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design
Business & Finance

Spain-France hydrogen pipeline exits pre-FEED phase en route to final subsea design

12 days ago