Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Lower Brule Plans Available for Public Review
Dredging

November 22, 2018 · about 7 years ago

Lower Brule Plans Available for Public Review

A draft feasibility report with environmental assessment to address shoreline erosion and restore degraded wetland and riparian habitats along Lake Sharpe near the town of Lower Brule, SD is currently available for public review. The draft report and EA evaluates the impacts of constructing a one-mi

1 minutes read
  • LinkedIn
  • X
  • Email

A draft feasibility report with environmental assessment to address shoreline erosion and restore degraded wetland and riparian habitats along Lake Sharpe near the town of Lower Brule, SD is currently available for public review.

The draft report and EA evaluates the impacts of constructing a one-mile long stone breakwater along the shoreline to reduce erosion which is imminently threatening the town’s sewage lagoons, the U.S. Army Corps of Engineers’ Omaha District said in their latest update.

In addition to shoreline erosion, reservoir filling and wind/wave and ice forces have caused habitat degradation which has negatively impacted Tribal members’ connection with the river and culturally significant natural resources.

Solutions to restore ecosystem function were evaluated including constructing a 50-foot wide earth-filled island that would be planted with cottonwoods, willows, and various other plant species that are culturally significant to the Lower Brule Sioux Tribe.

A shallow backwater/wetland would then be created between the island and the shoreline.

Comments should be postmarked or received no later than December 21, 2018, said USACE.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free