Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bombora awards contracts for mWave demonstrator
Business & Finance

December 3, 2018 · about 7 years ago

Bombora awards contracts for mWave demonstrator

Bombora Wave Power Europe has hired key suppliers for the delivery of the company’s mWave wave energy device.

2 minutes read
  • LinkedIn
  • X
  • Email

Bombora Wave Power Europe has hired key suppliers for the delivery of the company’s mWave wave energy device.

The European subsidiary of Australian-based Bombora awarded contracts for the design of the main structure for the mWave energy device, and for the delivery of an air turbine which forms the Bombora wave energy system.

Scottish engineering firm Apollo Offshore Engineering has been engaged for the mWave main structure design, which is said to be the key structural element of the demonstrator.

The primary function of the main 75-meter long structure is to secure the key assemblies and modules in a level position on the seabed, according to Welsh government’s procurement portal Sell2Wales.

The 1.5MW peak unidirectional air turbine for the mWave device demonstrator will be supplied by Portugal-based Kymaner Tecnologias Energeticas .

The company will also deliver associated duct work including output shaft with dynamic seal suitable for 12 months subsea deployment, according to Sell2Wales contract award notice.

The mWave device features a series of air-inflated rubber membranes mounted to a concrete structure on the sea floor.

As waves pass over the mWave, the air inside the membranes is squeezed into a duct and through a turbine. The turbine spins a generator to produce electricity. The air is then recycled to re-inflate the membranes to prepare them for the next wave.

To remind, Bombora Wave Power Europe was recently awarded £10.3 million of EU funding for the design and testing of its mWave device.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & MaintenanceResearch & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago