Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›USACE Proposes Dredging of Hampton Harbor Federal Navigation Project
Dredging

December 12, 2018 · about 7 years ago

USACE Proposes Dredging of Hampton Harbor Federal Navigation Project

The U.S. Army Corps of Engineers, New England District, is proposing to perform maintenance dredging of the Hampton Harbor Federal navigation project in Seabrook and Hampton, New Hampshire, and the state anchorage in Hampton. The proposed work involves maintenance dredging of the 8-foot Mean Lower L

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New England District, is proposing to perform maintenance dredging of the Hampton Harbor Federal navigation project in Seabrook and Hampton, New Hampshire, and the state anchorage in Hampton.

The proposed work involves maintenance dredging of the 8-foot Mean Lower Low Water (MLLW) anchorage on the Seabrook side, the 8-foot and 6-foot MLLW anchorage areas on the Hampton side, and the 8-foot MLLW inner channels connecting both areas with the entrance channel, plus an authorized 1 foot of overdepth, in the Hampton Harbor FNP.

Additionally, the proposed work involves maintenance dredging of the state of New Hampshire’s 6-foot MLLW anchorage, plus authorized overdepth.

“Maintenance dredging of approximately 150,000 cubic yards of sandy material from the authorized project area will maintain the Federal Navigation Project and state of New Hampshire Anchorage to required and authorized dimensions,” said Project Manager Ms. Coral Siligato , of the Corps’ New England District, Programs/Project Management Division in Concord, Mass.

Dredging will be conducted with a hydraulic dredge, hopper dredge, or combination of the two. The state’s maintenance project involves dredging approximately 2,500 cubic yards of sand from the upper 6-foot anchorage area in Hampton.

Construction activities involving hydraulic dredging will be performed during a five-month period between Oct. 1 and March 15. Dredging of the inner harbor would be performed between Oct. 15 and Feb. 1, dredging and placement activities in the entrance channel would occur between Oct. 15 and March 15, and work on the receiving beaches would occur between Oct. 1 and March 15.

In the event that the government-owned hopper dredge performs work in Hampton Harbor, the work would be limited to the entrance channel and would occur between May 1 and July 31, of the year in which the work takes place.

The work is currently anticipated to be performed in 2019/2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free