Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Macclesfield Canal Dredging on the Way
Dredging

December 18, 2018 · about 7 years ago

Macclesfield Canal Dredging on the Way

An extensive program of maintenance and repair worth £1.4 million is underway in Cheshire on the Macclesfield Canal this winter, reports the Canal & River Trust. The project includes massive dredging works that will take place over the next three months. According to the Canal & River Trust, the pro

1 minutes read
  • LinkedIn
  • X
  • Email

An extensive program of maintenance and repair worth £1.4 million is underway in Cheshire on the Macclesfield Canal this winter, reports the Canal & River Trust.

The project includes massive dredging works that will take place over the next three months.

According to the Canal & River Trust, the project is aimed at deepening the canal between Macclesfield and the canal’s junction with the Trent & Mersey Canal, near Kidsgrove.

The Trust also reported that on the landmark Bosley Lock Flight, they have installed new gates, carried out leak, masonry and pointing work, and repaired damaged sluices, gates and washwalls at locks 3, 5, 6, 8, 9 and 12. Much of this work was completed during the summer when navigation along the canal was restricted due to the drought.

A leaking culvert, near Swettenham Wharf in Macclesfield town center, is being repaired to prevent flooding and the canal bed is being re-lined in clay. Canal wall repairs are also being completed. The canal water levels are expected to be restored to normal in time for the Christmas holidays, added the Trust.

In Higher Poynton, the canal has been drained around the junction with the Burgess Arm to enable repairs to be carried out to the towpath and supporting walls.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free