Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›MCWD Dredging Project Underway
Dredging

December 20, 2018 · about 7 years ago

MCWD Dredging Project Underway

The Minnehaha Creek Watershed District (MCWD) is beginning dredging work on two stormwater ponds that clean polluted stormwater that runs off city streets in Minneapolis and Edina. The Southwest Bde Maka Ska Pond in Minneapolis filters runoff before it enters Bde Maka Ska (formerly known as Lake Cal

1 minutes read
  • LinkedIn
  • X
  • Email

The Minnehaha Creek Watershed District (MCWD) is beginning dredging work on two stormwater ponds that clean polluted stormwater that runs off city streets in Minneapolis and Edina.

The Southwest Bde Maka Ska Pond in Minneapolis filters runoff before it enters Bde Maka Ska (formerly known as Lake Calhoun) and the Pamela Park Pond Cell 1 in Edina filters runoff before it enters Minnehaha Creek.

Dredging involves excavating the sediment out of the ponds and hauling it away. Any disturbed vegetation will be restored in the spring.

About 2,000 cubic yards of sediment will be removed from Southwest Bde Maka Ska Pond, which was last dredged in 2012. At that time, the dredged sediment that was removed was near contamination, but current tests indicate the sediment is not contaminated this time around.

About 1,900 cubic yards of sediment will be removed from the Pamela Park Pond Cell 1 and will be the first dredging of this pond. The project is being conducted in partnership with the City of Edina.

Dredging is done during the cold weather months when the ground is frozen. The ponds will be “dewatered,” meaning the water will be pumped out of them and stored in an adjacent pond. The stormwater ponds will then be excavated using heavy machinery. The sediment from the ponds will be hauled offsite.

The work is expected to last through February.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Halliburton bags Eni’s deepwater bundle as Eastern Mediterranean gas buildout continues
  2. 2TechnipFMC picks up multimillion-dollar subsea scope for Petronas’ deepwater project
  3. 3Southeast Asia’s hydrocarbon push: Valeura hits oil pay, eyes new satellite development
  4. 4FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free