Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›News›Summit LNG Terminal in Bangladesh facing constraints on pipeline delays
News

January 15, 2019 · about 7 years ago

Summit LNG Terminal in Bangladesh facing constraints on pipeline delays

Summits LNG Terminal, a Summit Corporation unit, is set to start up in March as planned despite potential pipeline construction delays.

1 minutes read
  • LinkedIn
  • X
  • Email

Illustration purposes only (Image courtesy of Summit Corporation)

Summit LNG Terminal, a Summit Corporation unit, is set bring its LNG import project in Bangladesh online in March as planned despite potential pipeline construction delays.

Citing sources familiar to the matter, Reuters reports that the pipeline that would connect the FSRU to the coastal city of Chattogram has not been fully built which would restrict the flows of regasified LNG from Bangladesh’s second import facility to the transmission network.

The pipeline delays will result in the FSRU supplying about 300 million cubic feet of natural gas per day to the transmission network.

The FSRU to be provided by Excelerate Energy has the capacity to supply approximately 500 million cubic feet per day of natural gas to the national grid.

The unit, with the capacity to store 138,000 cubic meters, will be moored 6 kilometers off the coast of the island of Moheshkali in the Cox Bazar District of Chittagong Division in Bangladesh, where it will receive and regasify LNG procured by Petrobangla, the national oil and energy company.

In August last year, Japan’s Mitsubishi Corporation acquired a 25 percent interest in Summit LNG Terminal.

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

News

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free