Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›MDL Deploys 150Te Tensioner in Nigeria
Business & Finance

January 29, 2019 · about 7 years ago

MDL Deploys 150Te Tensioner in Nigeria

Maritime Developments (MDL) has proven the complete portability of its flex-lay equipment design with a recently completed project in West Africa. The newest and largest pipelay tensioner in the company’s rental fleet, the MDL TTS-4/375 Series Tensioner was used for installation of oil offloading li

2 minutes read
  • LinkedIn
  • X
  • Email

Maritime Developments (MDL) has proven the complete portability of its flex-lay equipment design with a recently completed project in West Africa.

The newest and largest pipelay tensioner in the company’s rental fleet, the MDL TTS-4/375 Series Tensioner was used for installation of oil offloading lines offshore Nigeria.

The system was mobilised from MDL Peterhead facility in 4 modules onto trucks for transport to port, where it was reassembled off critical path before being lifted onto a cargo vessel in a single lift.

Once at the project mobilisation port in Lagos, it was then lifted from the cargo vessel directly onto the project vessel and installed onto the client’s HLS ramp, also manufactured by MDL in Peterhead.

“ We’re glad that we were able to launch our largest tensioner yet in a market that may pose some mobilisation challenges, where the ability to perform a vessel-to-vessel installation really comes into play ,” said Greig May , MDL rental projects manager.

“The TTS-4/375 was the client’s preferred solution because of its road-transportability, as well as the proven track record of MDL tensioners to date.

“A key requirement for this project was the use of non-serrated steel pads, specified by the product manufacturer. The product specification also drove the requirement for a 5.5m track contact length.

“Through the dedication and experience of our internal onshore and offshore personnel, and the professionalism of the client project team, the product was installed safely and with no incidents over the fourteen-month contract duration from award to return of the equipment to MDL’s base,” explained May.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago