Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Channel Islands Improvement Plan Available
Dredging

February 1, 2019 · about 7 years ago

Channel Islands Improvement Plan Available

The Los Angeles District of the U.S. Army Corps of Engineers plans to conduct repairs to the Channel Islands Harbor facility, a structure consisting of two parallel entrance jetties and a protective offshore breakwater near the entrance to the harbor. The project area will encompass approximately 60

1 minutes read
  • LinkedIn
  • X
  • Email

The Los Angeles District of the U.S. Army Corps of Engineers plans to conduct repairs to the Channel Islands Harbor facility, a structure consisting of two parallel entrance jetties and a protective offshore breakwater near the entrance to the harbor.

The project area will encompass approximately 60 acres of harbor channel, stone jetties, and an offshore breakwater at the facility.

Repair work consists of furnishing and placing approximately 30,000 tons of new armor stone, having a median stone size of 15 tons, and resetting existing armor stone as needed.

The project is to repair and restore damaged areas of the harbor breakwater and jetties to original design elevations and slopes.

“Repairs would be conducted by a barge-mounted crane, barges carrying rock, and other various support vessels. Transport of stone would likely be by sea but may occur on land using tractor trailer trucks or other heavy equipment vehicles. Staging/storage areas near the harbor for the proposed maintenance repair project would be utilized for construction equipment and supplies ,” said USACE.

“The staging area would be within the paved Kiddie Beach Park parking lot along South Victoria Avenue, the Silver Strand Beach parking lot, and/or a portion of the beach adjacent to the parking lot.”

The Environmental Assessment is being prepared in compliance with the National Environmental Protection Act (NEPA) other Federal laws, regulations, Executive Orders, and USACE’s policies.

The deadline for submitting the comments is February 15, 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free