Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›German TSOs Raise Offshore Wind Targets in Draft Grid Development Plan
Offshore Wind

February 5, 2019 · about 7 years ago

German TSOs Raise Offshore Wind Targets in Draft Grid Development Plan

German transmission system operators (TSOs) have issued the first draft of the Grid Development Plan (GDP) 2030, which includes expanded offshore wind capacity scenarios. According to 50Hertz, Amprion, TenneT and TransnetBW, the expansion targets have been increased to 17GW in scenarios B and C 2030

2 minutes read
  • LinkedIn
  • X
  • Email

German transmission system operators (TSOs) have issued the first draft of the Grid Development Plan (GDP) 2030, which includes expanded offshore wind capacity scenarios.

According to 50Hertz, Amprion, TenneT and TransnetBW, the expansion targets have been increased to 17GW in scenarios B and C 2030, 20GW in scenario A 2030 and 23.2GW by 2035, compared to the 15GW by 2030 target set in the Renewables Act.

The targets require additional offshore grid in the length of 1.924km in scenario B 2030 with a transmission capacity of some 6.4GW and a length of 3,439km for scenario B 2035, with a transmission capacity of circa 12.1GW.

Based on the approved scenario framework, the Baltic Sea will house 2,2GW in all scenarios, with the North Sea anticipated to accommodate 17,8GW in the A 2030 scenario, 14,8GW in the B and C 2030 scenario and 21GW in the B 2035 scenario.

The estimated investment volume for the offshore grid is approximately EUR 18 billion for scenarios B 2030 and C 2030, EUR 24 billion for scenario A 2030 and some EUR 27 billion for scenario B 2035, the German TSOs said.

According to the draft, the results from an additional sensitivity calculation show that an increase in feed-in by 1GW from offshore wind from areas in the Baltic Sea that are easy to develop can be accommodated by grid infrastructure that has already been planned, resulting in additional flexibility for the political expansion target in 2030 with a bandwidth of 17GW to 20GW.

Interested parties are free to submit comments on the GDP until 4 March, which will be taken into consideration for the second draft due to be submitted to the Federal Network Agency for evaluation.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindStorage

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem hands Saudi jack-up fleet to ADES in strategic shallow-water exit
  2. 2Valeura advances Gulf of Thailand expansion with PTTEP farm-in approval
  3. 3Santos broadens Asia-Pacific LNG portfolio with Canadian supply and 10-year POSCO deal
  4. 4Borr Drilling keeps three jack-up rigs as it reorganizes Mexico ops with stake sale

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free