Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Trendsetter delivers subsea equipment for Noble’s Leviathan project
Equipment

February 13, 2019 · about 7 years ago

Trendsetter delivers subsea equipment for Noble’s Leviathan project

Trendsetter Engineering has completed the design and build of subsea production equipment for Noble Energy’s Leviathan project.

2 minutes read
  • LinkedIn
  • X
  • Email

Houston-based oil and gas service company Trendsetter Engineering has completed the design and build of subsea production equipment for Noble Energy’s Leviathan project, a large natural gas field development in the Eastern Mediterranean Sea off the coast of Israel.

Announcing the milestone on Tuesday, Trendsetter said that the process took over two years of effort.

Trendsetter’s scope of work included multiple clamp connection systems, subsea distribution equipment, MEG filter modules, 2” connection systems and subsea manifolds.

“This project has been a job well done by all those who contributed from Trendsetter and Noble Energy. I’m confident that few other companies could have accomplished all we did at the level of quality, safety and overall cost and schedule performance,” said Antony Matson , Vice-President of Projects.

Mario R. Lugo PE, CEO and Chairman, said: “For over 20 years, Trendsetter Engineering has continually delivered groundbreaking technology to the industry. We would like to thank our partners at Noble Energy for this tremendous opportunity.”

Discovered in 2010, the Leviathan, holding around 22 trillion cubic feet of gross recoverable resources, is one of the largest natural gas discoveries in the world. It is being developed using a subsea system that will connect production wells to a fixed platform located offshore with tie-in onshore in the northern part of Israel.

Noble Energy is the operator of the Leviathan field with a 39.66% interest and its two partners in the field are Delek Drilling and Ratio Oil with 45.34% and 15%, respectively.

As reported earlier on February, Noble Energy has already launched the jacket for the Leviathan drilling platform offshore Israel. The platform jacket was put on a 180-meter barge in Texas, and crossed the Atlantic Ocean in 28 days, traveling a distance of 11,500 kilometers. The jacket, which took 18 months to build, is 98 meters high and weigh 15,500 tons.

First gas sales from the project are on schedule by the end of 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Equipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago

Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 3 months ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Neptun Deep jacket; Source: Saipem
Business & Finance

Jacket for EU’s largest offshore gas development sails away from Saipem’s shipyard

about 1 month ago
Red Rock commissions Nexans Electra’s crane systems
Business Developments & Projects

Red Rock commissions Nexans Electra’s crane systems

about 3 months ago