Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Kawasaki Delivers LNG Carrier Shinshu Maru to JERA-NYK Line JV
Shipbuilding

February 15, 2019 · about 7 years ago

Kawasaki Delivers LNG Carrier Shinshu Maru to JERA-NYK Line JV

Shinshu Maru will transport LNG procured via the Freeport LNG Project in the U.S.

1 minutes read
  • LinkedIn
  • X
  • Email

Kawasaki Heavy Industries has delivered the 177,000 m3 LNG carrier Shinshu Maru to the Trans Pacific Shipping 7 Limited joint venture.

Shinshu Maru is the second of Kawasaki’s line of 177,000 m3 capacity LNG carriers to be commissioned and is designed to enable passage through the expanded Panama Canal, which opened for full operations in 2016.

The Trans Pacific Shipping 7 Limited joint venture, formed by JERA Co., Inc. and NYK Line, will use the 299.9-meter vessel to transport LNG procured via the Freeport LNG Project in the U.S.

Shinshu Maru was delivered following a christening ceremony in January 2019.

As revealed by Kawasaki, the Bahamas-registered vessel features standard LNG carrier hull dimensions in order to enable docking at major LNG terminals around the world. It is equipped with four independent Moss LNG tanks protected by a double-hull and double-bottom design. The carrier boasts an LNG boil-off rate of no more than approximately 0.08% per day.

The company said it has additionally optimized the hull structure to decrease overall ship weight and adopted a two-motor, twin-screw propulsion system. The ship’s dual fuel diesel (DFD) engine is capable of burning both oil and gas, the company noted.

Kawasaki said it would continue to pursue shipbuilding operations in light of the anticipated rise in demand for LNG and other clean-energy fuels.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free